2 Sets of 10.5 MW Gas-Fired Boilers for Heat Supply Project

April 8, 2024

Available industries:Heating Industry

Project boiler medium:Hot water

Capacity:10.5 MW

Equipment:WNS10.5-1.6/115/70-Q

2 Sets of 10.5 MW Gas-Fired Boilers for Heat Supply Project

2 Sets of 10.5 MW Gas-Fired Boilers for Heat Supply Project

Introduction

The Aviation Enterprise Service Island project, located in the Airport Economic Zone near Beijing Daxing Airport, Langfang City, Hebei Province, is a significant investment with a focus on delivering continuous and stable heating supply. To meet the heating demands during the cold winter season, the project incorporates ZOZEN two sets of 10.5 MW WNS series gas hot water boilers.

Two sets of 10.5 MW gas-fired boilers are equipped with advanced combustion technology and heat exchange systems, enabling efficient energy conversion. These features optimize energy utilization and facilitate effective energy management, ensuring maximum heating efficiency for the Aviation Enterprise Service Island.

Designed to withstand the harsh winter environment of northern China, the boilers exhibit exceptional operational stability under various climatic conditions. Two sets of 10.5 MW gas-fired boilers are engineered to reliably meet the heating demand of the Aviation Enterprise Service Island throughout the winter season, ensuring uninterrupted operations in challenging weather conditions.

ZOZEN 10.5 MW gas-fired boilers comply with stringent environmental protection standards, both during manufacturing and operation. These boilers effectively control pollutant emissions, minimizing their impact on the environment and contributing to sustainable heating solutions for the Aviation Enterprise Service Island.

In addition to their performance, the total cost of the hot water boilers stands out among various options. Factors such as operational efficiency, maintenance requirements, and equipment lifespan have been carefully considered, making these boilers an economically viable choice for the project.

ZOZEN Boiler is committed to ensuring the smooth progress of the Aviation Enterprise Service Island project. ZOZEN provides comprehensive technical consultations and service support to assist customers at every stage of the project. This ensures efficient boiler operation and facilitates the successful implementation of the heating system.

More Boiler Cases

DHL 15tons Coal Boiler for Oleochemical Industry in Indonesia

Available industries: Food Factory Project boiler medium:Steam Capacity:15tons Equipmen...

25 Ton Gas Steam Boiler for Food Industry

Available industries: Sugar Mill Project boiler medium:Steam Capacity:25 Ton Equipment...

35tons Coal-fired Steam Boilers for Zimbabwe Chemical Industry

Available industries: Feed Industry Project boiler medium:Steam Capacity:35tons Equipme...

Pharmaceutical Factory 4 Tons Biomass Steam Boiler

Available industries: Pharmaceutical Factory Project boiler medium: Steam Capacity: 4 ton p...